
Plan
Put the trade workflow into the live job plan.
Bring enquiries, job details and responsibilities together from the start.
Groundworks RAMS, permits, site diaries, plant checks, photos, quality records and delay evidence. One platform for documents, evidence and compliance.


Industry workflow
Groundworkers need daily evidence for changing site conditions, plant, permits, photos, inspections, delays and completion records.
Problem
Problem
Problem
Connect groundworkers requirements with planning, controlled documents, site evidence and reporting in Zektrx.

Plan
Bring enquiries, job details and responsibilities together from the start.

Prove
Keep trade-specific documents and evidence attached to the relevant job.

Review
Use delivery records to prepare reports, audit evidence and client handovers.
Zektrx gives each industry page a clearer operational story: trade-specific work, controlled site evidence and management review all staying connected in one record.

Trade record
Evidence
Photos, forms, RAMS, permits, actions and close-out records stay attached to the workflow they support.
Review
A clearer record makes missing owners, unsigned briefings and incomplete handover evidence easier to catch.
Step 1
Turn repeat groundworkers work into a job record with scope, documents, people, dates and responsible owners before site work starts.
Step 2
Connect RAMS, method statements, permits, inspections and evidence so the groundworkers team is working from the right version.
Step 3
Collect photos, documents, actions, completion records and client-ready evidence without rebuilding a pack at the end.
The page structure stays shared. The terminology layer changes the safety document, standards, currency, date format and unit context for the selected market.
Safety document
RAMS
Risk wording
Risk Assessment
Currency
GBP (ยฃ)
Units
metric
Regulator
HSE
Date format
DD/MM/YYYY
1. Learn
A practical guide to connecting construction inspections, defects, photos, approvals, non-conformance records and handover evidence.
UK mechanical contractor software guide for RAMS, COSHH, plant records, permits, inspections, O&M evidence and Zektrx workflow rollout.
A handover evidence index template covering drawings, certificates, warranties, inspections, photos, approvals and missing items.
2. Use
Estimate postcrete bags for fence posts, signs and small concrete holes. Free online tool for UK construction and trade teams.
Screen work-at-height task risk using height, duration, people and control rating. Free online tool for UK construction and trade teams.
Estimate hand-arm vibration A(8) exposure from vibration magnitude and trigger time. Free online tool for UK construction and trade teams.
3. Automate
Connect mechanical RAMS, plant records, documents, inspections and handover.
Connect RAMS, incidents, training, permits, inspections and safety evidence.
Capture inspections, photos, actions, owners and close-out evidence.
4. Start
Move from static documents into controlled RAMS with review, signatures, revisions and evidence.
Create RAMSRelated Guides
A practical guide to connecting construction inspections, defects, photos, approvals, non-conformance records and handover evidence.
UK mechanical contractor software guide for RAMS, COSHH, plant records, permits, inspections, O&M evidence and Zektrx workflow rollout.
A handover evidence index template covering drawings, certificates, warranties, inspections, photos, approvals and missing items.
Related Calculators
Estimate postcrete bags for fence posts, signs and small concrete holes. Free online tool for UK construction and trade teams.
Screen work-at-height task risk using height, duration, people and control rating. Free online tool for UK construction and trade teams.
Estimate hand-arm vibration A(8) exposure from vibration magnitude and trigger time. Free online tool for UK construction and trade teams.
Related Templates
Check equipment condition, guards, inspections, certificates, defects and safe use controls. Free printable construction template from Zektrx.
Define hold points, witness points, acceptance criteria and evidence for quality control. Free printable construction template from Zektrx.
Check waste, spill controls, noise, dust, drainage, storage and environmental actions. Free printable construction template from Zektrx.
Related Features
Connect mechanical RAMS, plant records, documents, inspections and handover.
Connect RAMS, incidents, training, permits, inspections and safety evidence.
Capture inspections, photos, actions, owners and close-out evidence.
Related Industries
Mechanical contractor RAMS, permits, plant records, drawings, inspections and handover workflows. One platform for documents, evidence and compliance.
Scaffolding contractor RAMS, inspections, handover certificates, permits, photos and site evidence. One platform for documents, evidence and compliance.
RAMS, drawings, workshop records, install evidence and handover workflows for steel fabricators. One platform for documents, evidence and compliance.
Related Comparisons
Compare Zektrx with SafetyCulture for contractors that need inspections plus RAMS, permits, documents, actions, site diaries and construction evidence packs.
A construction management software buyer guide for teams comparing project controls, site records, documents, compliance and contractor operations.
Compare Zektrx with Procore for contractors that need RAMS, site evidence, document control and day-to-day trade operations without enterprise complexity.
Related FAQs
Yes. O&M, document and evidence workflows can support mechanical handover packs.
From Mechanical Contractors Software
Yes. Equipment and service workflows can keep records visible.
From Mechanical Contractors Software
Yes. Document control can connect revisions and evidence to job records.
From Mechanical Contractors Software
Yes. Inspection workflows can record checks, actions, photos and close-out evidence.
From Scaffolders Software
Yes. Site diary workflows can capture labour, weather, progress, conditions, delays and evidence.
Yes. Equipment and service workflows can support reminders and evidence.
Yes. Diary and evidence records can support delay reporting.
Next Step
Move from static documents into controlled RAMS with review, signatures, revisions and evidence.