Method Statement Template.
Plan the safe sequence of work, people, plant, materials, controls and hold points.
Template Actions
Use this template.
Print a static copy here, or create a free Zektrx account for editable records, signatures, owners, evidence and review workflows.
The sections to control.
Use this printable structure for a quick start, then move it into Zektrx when you need owners, evidence, revisions, signatures and reporting.
Section 1
Scope
Section 2
Resources
Section 3
Access
Section 4
Sequence
Section 5
Controls
Section 6
Inspection and handover
Related Templates
Keep building the pack
Method Statement Template
Plan sequence, people, equipment, controls and acceptance evidence.
RAMS Template
Structure task hazards, controls, signatures and review evidence.
RAMS Template
A controlled structure for task hazards, method statement steps, controls, signatures and review evidence.
Subcontractor Prequalification Checklist
Check insurance, competence, RAMS, accreditations and supplier evidence.
Calculators
Support the numbers
Delivery Capacity Calculator
Estimate delivery capacity from vehicles, trips, capacity per trip and working days.
Equipment Service Reminder Calculator
Estimate missed service and inspection exposure across equipment.
Material Quantity Calculator
Estimate material quantity from area, usage rate and waste allowance.
Project Duration Calculator
Estimate project duration from work quantity, productivity and crew count.
Software
Make it editable
Method Statement Software
Standardise method statements and keep revisions connected to site work.
RAMS Generator
Generate task-ready RAMS from reusable templates and project context.
RAMS Software
Create, review and manage RAMS, method statements, signatures and evidence.
Construction Health and Safety Software
Connect RAMS, incidents, training, permits, inspections and safety evidence.
Read the guidance.
RAMS Guide: What to Check Before Work Starts
A practical pre-start RAMS guide for checking scope, hazards, controls, signatures and site evidence before a job begins.
RAMS Revision Control Guide for Contractors
A guide to controlling RAMS revisions, signatures, briefings and superseded documents when project conditions change.
Method Statement Template Setup Guide
How to prepare a reusable method statement template that still leaves room for site-specific controls and evidence.
RAMS for Electrical Contractors: Common Controls to Review
A RAMS guide for electrical contractors covering scope, isolation, access, permits, competence and evidence checks.
Template questions.
What makes a good method statement?
It should be specific enough for supervisors and operatives to understand sequence, controls and responsibilities.
Can Zektrx reuse method steps?
Yes. Common sequences can become reusable templates for faster RAMS generation.
Next Step
Create the editable version in Zektrx.
Turn this template into a live contractor workflow with signatures, actions, evidence, ownership, reporting and pricing routes connected.