RAMS Template.
A controlled structure for task hazards, method statement steps, controls, signatures and review evidence.
Template Actions
Use this template.
Print a static copy here, or create a free Zektrx account for editable records, signatures, owners, evidence and review workflows.
The sections to control.
Use this printable structure for a quick start, then move it into Zektrx when you need owners, evidence, revisions, signatures and reporting.
Section 1
Project details
Section 2
Task scope
Section 3
Hazards and controls
Section 4
Method sequence
Section 5
Briefing and signatures
Section 6
Revision history
Related Templates
Keep building the pack
RAMS Template
Structure task hazards, controls, signatures and review evidence.
Construction Risk Assessment Template
Identify hazards, people at risk, existing controls, further actions and review dates.
Method Statement Template
Plan sequence, people, equipment, controls and acceptance evidence.
Method Statement Template
Plan the safe sequence of work, people, plant, materials, controls and hold points.
Calculators
Support the numbers
HAVS Calculator
Estimate hand-arm vibration A(8) exposure from vibration magnitude and trigger time.
Ladder Angle Calculator
Check ladder angle and vertical reach using ladder length and wall distance.
Manual Handling Calculator
Create a simple manual handling risk score from load, frequency, distance and twisting.
Noise Exposure Calculator
Estimate daily noise exposure from sound level and exposure duration.
Software
Make it editable
RAMS Software
Create, review and manage RAMS, method statements, signatures and evidence.
Method Statement Software
Standardise method statements and keep revisions connected to site work.
Risk Assessment Software
Build controlled risk assessments with owners, review dates and linked evidence.
POWRA Software
Capture point-of-work risk checks and daily task controls.
Read the guidance.
RAMS Guide: What to Check Before Work Starts
A practical pre-start RAMS guide for checking scope, hazards, controls, signatures and site evidence before a job begins.
Work at Height RAMS Guide for Contractors
A practical RAMS guide for reviewing access, edge protection, rescue plans, competence and evidence before work at height.
RAMS Revision Control Guide for Contractors
A guide to controlling RAMS revisions, signatures, briefings and superseded documents when project conditions change.
Method Statement Template Setup Guide
How to prepare a reusable method statement template that still leaves room for site-specific controls and evidence.
Template questions.
Can this become an editable Zektrx workflow?
Yes. Create a free Zektrx account to turn the printable structure into reusable RAMS records.
Should RAMS be reviewed for every project?
Yes. Review RAMS against the actual site, task, people, equipment and controls.
Next Step
Create the editable version in Zektrx.
Turn this template into a live contractor workflow with signatures, actions, evidence, ownership, reporting and pricing routes connected.