Why revision control matters
Drawing revisions affect what teams build, inspect, photograph and hand over. If the current drawing is unclear, site teams can waste time or install against stale information.
Basic revision controls
- Keep one drawing register
- Record drawing number, title, revision and status
- Mark superseded versions clearly
- Track who received each issue
- Link comments, approvals and RFIs
- Tie site evidence to the current revision where possible
Make issue history visible
Revision control is stronger when the record shows how the drawing moved through review, issue and use on site. Keep approval evidence and distribution history close to the file.
Zektrx connects Construction Drawing Management Software, Construction Document Control Software and Construction Quality Management Software around the job record.
Next step
Use the Drawing Revision Control Checklist, review the Document Control Checklist, or start a ยฃ5 for 14 days trial.
Related Zektrx workflow
More ways to use this document control guide.
Put it into practice
Turn this guide into a working Zektrx workflow.
Start with the ยฃ5 for 14 days trial, then connect RAMS, jobs, stock, documents, records and reporting in one place.