Skip to main content
Zektrx
View Demo
Topic Cluster

RAMS resources.

Risk assessment and method statement guidance, templates, software and calculators.

What this cluster covers

RAMS combine the hazards, controls, sequence, responsibilities, signatures and evidence that prove a task has been planned before work starts.

ramsrisk assessmentmethod statementsafety
Subject Overview

Build the record, then automate it.

Check

What hazards need controlling?

Check

Who has reviewed the RAMS?

Check

Which version was accepted on site?

Related Articles

Latest guidance in this cluster.

RAMS Guides2 min

RAMS Guide: What to Check Before Work Starts

A practical pre-start RAMS guide for checking scope, hazards, controls, signatures and site evidence before a job begins.

RAMS Guides1 min

Work at Height RAMS Guide for Contractors

A practical RAMS guide for reviewing access, edge protection, rescue plans, competence and evidence before work at height.

RAMS Guides1 min

RAMS Revision Control Guide for Contractors

A guide to controlling RAMS revisions, signatures, briefings and superseded documents when project conditions change.

Templates1 min

Method Statement Template Setup Guide

How to prepare a reusable method statement template that still leaves room for site-specific controls and evidence.

RAMS Guides1 min

RAMS for Electrical Contractors: Common Controls to Review

A RAMS guide for electrical contractors covering scope, isolation, access, permits, competence and evidence checks.

RAMS Guides1 min

POWRA Guide: Daily Dynamic Risk Checks

A practical guide for point of work risk assessments, daily checks, changed conditions, controls and site evidence records.

Industry News1 min

Digital Permit to Work Trends for Contractors

Industry commentary on digital permit to work workflows, mobile evidence, isolations, handovers, approvals and live site controls.

RAMS Guides1 min

RAMS Guide for Roofing Contractors

A practical RAMS guide for roofing contractors covering access, fragile surfaces, weather, edge protection, lifting and site evidence.

Industry News1 min

AI-Assisted RAMS Drafting: What Still Needs Human Review

Industry news style guidance on using AI to support RAMS drafting while keeping competent review and site-specific checks in place.

RAMS Guides1 min

COSHH and RAMS: Substance Control Guide

A RAMS guide for connecting COSHH assessments, substances, controls, PPE, storage, emergency arrangements and site evidence.

Construction Calculators1 min

Document Revision Risk Calculator

A calculator-style resource for spotting revision control risk across drawings, RAMS, permits and project documents.

Safety Articles1 min

Permit to Work Handover Checks

A safety guide for checking permit status, responsibilities, isolations, handover notes and evidence when work changes hands.

FAQ

Common questions.

What should contractors review for rams?

Start with the live records that prove ownership, review, acceptance, evidence and close-out. Then connect those records to the right Zektrx module.

How are related articles selected?

Related articles are matched from resource tags, categories, titles, keywords and linked software pages so new content joins the cluster automatically.

Can Zektrx turn these resources into workflows?

Yes. Zektrx connects templates, records, signatures, actions, evidence and reports so guidance can become a live contractor workflow.

Next Step

Turn rams into controlled workflows.

Use Zektrx to connect records, templates, evidence, signatures, actions and reports across your contractor operations.

Discuss Zektrx