Method Statements resources.
Method statement setup, revision control, task sequencing and site acceptance.
What this cluster covers
Method statements explain how work will be completed safely and consistently, linking sequence, people, plant, controls and sign-off.
Build the record, then automate it.
Check
Does the sequence match the site?
Check
What plant and access are needed?
Check
Who accepts the method?
Latest guidance in this cluster.
RAMS Guide: What to Check Before Work Starts
A practical pre-start RAMS guide for checking scope, hazards, controls, signatures and site evidence before a job begins.
RAMS Revision Control Guide for Contractors
A guide to controlling RAMS revisions, signatures, briefings and superseded documents when project conditions change.
Method Statement Template Setup Guide
How to prepare a reusable method statement template that still leaves room for site-specific controls and evidence.
RAMS for Electrical Contractors: Common Controls to Review
A RAMS guide for electrical contractors covering scope, isolation, access, permits, competence and evidence checks.
Work at Height RAMS Guide for Contractors
A practical RAMS guide for reviewing access, edge protection, rescue plans, competence and evidence before work at height.
RAMS Guide for Roofing Contractors
A practical RAMS guide for roofing contractors covering access, fragile surfaces, weather, edge protection, lifting and site evidence.
AI-Assisted RAMS Drafting: What Still Needs Human Review
Industry news style guidance on using AI to support RAMS drafting while keeping competent review and site-specific checks in place.
Construction KPI Dashboard Starter Guide
A starter guide for contractor KPI dashboards covering safety, compliance, quality, programme, cost and action measures.
Site Diary Delay Evidence Guide
A safety and operations article for recording delay evidence in site diaries with photos, actions, instructions and daily context.
Subcontractor Onboarding Evidence Checklist
A checklist for onboarding subcontractors with insurance, training, RAMS, inductions, approvals and expiry evidence before work starts.
Connected Project Modules and AI Project Manager Guide
Guide to connecting RAMS, drawings, RFIs, site diary, snagging, documents, quality, workforce, procurement, commercials and AI project manager workflows.
Principal Contractor Workspace Feature Guide
Guide to the Zektrx principal contractor workspace for subcontractors, RAMS approvals, drawings, RFIs, permits, quality and handover.
Software
Related features
Templates
Useful templates
Calculators
Relevant calculators
Compare
Comparison guides
Best RAMS Software
A practical buyer guide for choosing RAMS software that supports risk assessments, method statements, revisions, signatures and site evidence.
Zektrx vs Paper RAMS
Compare Zektrx with paper RAMS and Word/PDF RAMS packs for contractors that need signatures, revisions, review evidence and site acceptance.
Zektrx vs SafetyCulture
Compare Zektrx with SafetyCulture for contractors that need inspections plus RAMS, permits, documents, actions, site diaries and construction evidence packs.
Common questions.
What should contractors review for method statements?
Start with the live records that prove ownership, review, acceptance, evidence and close-out. Then connect those records to the right Zektrx module.
How are related articles selected?
Related articles are matched from resource tags, categories, titles, keywords and linked software pages so new content joins the cluster automatically.
Can Zektrx turn these resources into workflows?
Yes. Zektrx connects templates, records, signatures, actions, evidence and reports so guidance can become a live contractor workflow.
Next Step
Turn method statements into controlled workflows.
Use Zektrx to connect records, templates, evidence, signatures, actions and reports across your contractor operations.