What a handover pack should show
A handover pack should show that the work is complete, evidence is available and the client has the information needed to use or maintain the finished work.
Checklist
- Scope and completion summary
- Final drawings, revisions and marked-up records
- O&M manuals, warranties and certificates
- Test, inspection and commissioning evidence
- Snag list, closeout photos and sign-offs
- Client acceptance and contact details
Build the pack as the job progresses
The best handover pack is assembled during delivery. Link photos, inspections, manuals and certificates to the job as they arrive so completion is not a last-minute document chase.
Zektrx links Project Handover Software Checklist, O&M Manual Software and Site Operations Software for job-level closeout control.
Next step
Use Construction Quality Management Software, prepare with the Contractor Setup Pack, or start a ยฃ5 for 14 days trial.
Related Zektrx workflow
More ways to use this o&m manuals guide.
Put it into practice
Turn this guide into a working Zektrx workflow.
Start with the ยฃ5 for 14 days trial, then connect RAMS, jobs, stock, documents, records and reporting in one place.