Skip to main content
Zektrx
Country, language & terminologyUnited Kingdom ยท English ยท RAMS/COSHH

Country and terminology

Language

Request Demo
O&M manuals

O&M manual checklist for construction handover

An O&M manual checklist for collecting manuals, certificates, drawings, warranties, asset records and completion evidence.

1 min read

Share this resource

Share options ready.

Zektrx O&M manual and handover evidence workflow preview

What an O&M manual should collect

An O&M manual should help the client operate, maintain and understand the completed works. For contractors, it is also a record that completion evidence has been gathered and organised.

Checklist

  • Asset list and locations
  • Manufacturer manuals and data sheets
  • Warranties, certificates and test records
  • As-built drawings and revision references
  • Maintenance instructions and recommended intervals
  • Commissioning, inspection and sign-off evidence
  • Contact details and document index

Start before handover week

O&M manuals are much easier when evidence is collected during the job, not chased after practical completion. Assign ownership early and link required items to the job checklist.

Zektrx connects O&M Manual Software, Project Handover Software Checklist and Construction Document Control Software.

Next step

Use the O&M Manual Checklist, download the Contractor Setup Pack, or start a ยฃ5 for 14 days trial.

Put it into practice

Turn this guide into a working Zektrx workflow.

Start with the ยฃ5 for 14 days trial, then connect RAMS, jobs, stock, documents, records and reporting in one place.

Knowledge Journey

Learn, use, then automate.

1. Learn

2. Use

3. Automate

4. Start

Start a Zektrx workflow.

Connect resources, calculators, templates, evidence and software modules around the way your contractor team works with the ยฃ5 trial.

Start ยฃ5 Trial
Related Content

Connected resources for this topic.

Related Guides

Keep learning

Related Calculators

Run the numbers

Related Templates

Document the work

Related Features

Automate the workflow

Related Industries

Trade workflows

Related Comparisons

Compare options

Related FAQs

FAQ

Questions about this resource.

Who should use this o&m manuals resource?

This resource is for contractor, site, compliance and operations teams reviewing o&m manual checklist for construction handover and deciding which records should become controlled workflows.

Can this be managed in Zektrx?

Yes. Zektrx is designed to turn recurring construction checklists, documents, actions, signatures and evidence into connected workflows.

Is this a replacement for competent professional advice?

No. Use this as practical workflow guidance and keep competent legal, safety, engineering or site-specific review where required.

Put it into practice

Start a Zektrx workflow.

Connect resources, calculators, templates, evidence and software modules around the way your contractor team works with the ยฃ5 trial.

Start ยฃ5 Trial

Share the article

Share options ready.