Permits to Work resources.
Permit to work controls, approvals, isolation, handback and audit evidence.
What this cluster covers
Permit workflows help teams control higher-risk work by linking scope, controls, competent approval and handback evidence.
Build the record, then automate it.
Check
What work is authorised?
Check
Which controls must be in place?
Check
Who closes the permit?
Latest guidance in this cluster.
Digital Permit to Work Trends for Contractors
Industry commentary on digital permit to work workflows, mobile evidence, isolations, handovers, approvals and live site controls.
Permit to Work Handover Checks
A safety guide for checking permit status, responsibilities, isolations, handover notes and evidence when work changes hands.
RAMS Guide for Roofing Contractors
A practical RAMS guide for roofing contractors covering access, fragile surfaces, weather, edge protection, lifting and site evidence.
RAMS for Electrical Contractors: Common Controls to Review
A RAMS guide for electrical contractors covering scope, isolation, access, permits, competence and evidence checks.
RAMS Guide: What to Check Before Work Starts
A practical pre-start RAMS guide for checking scope, hazards, controls, signatures and site evidence before a job begins.
Subcontractor Prequalification Template Guide
A template guide for collecting subcontractor insurance, competence, safety and compliance evidence before work starts.
Workforce and Equipment Readiness Checklist
Checklist for workforce attendance, competencies, equipment checks, servicing, QR scan records and quarantine status before work starts.
Construction KPI Dashboard Starter Guide
A starter guide for contractor KPI dashboards covering safety, compliance, quality, programme, cost and action measures.
Site Diary Delay Evidence Guide
A safety and operations article for recording delay evidence in site diaries with photos, actions, instructions and daily context.
Subcontractor Onboarding Evidence Checklist
A checklist for onboarding subcontractors with insurance, training, RAMS, inductions, approvals and expiry evidence before work starts.
Principal Contractor Workspace Feature Guide
Guide to the Zektrx principal contractor workspace for subcontractors, RAMS approvals, drawings, RFIs, permits, quality and handover.
Construction Quality and Snagging Evidence Guide
Guide to quality and snagging evidence covering photos, locations, owners, due dates, defects, close-out notes and client reports.
Software
Related features
Templates
Useful templates
Calculators
Relevant calculators
Compare
Comparison guides
Zektrx vs SafetyCulture
Compare Zektrx with SafetyCulture for contractors that need inspections plus RAMS, permits, documents, actions, site diaries and construction evidence packs.
Best RAMS Software
A practical buyer guide for choosing RAMS software that supports risk assessments, method statements, revisions, signatures and site evidence.
Zektrx vs Paper RAMS
Compare Zektrx with paper RAMS and Word/PDF RAMS packs for contractors that need signatures, revisions, review evidence and site acceptance.
Common questions.
What should contractors review for permits to work?
Start with the live records that prove ownership, review, acceptance, evidence and close-out. Then connect those records to the right Zektrx module.
How are related articles selected?
Related articles are matched from resource tags, categories, titles, keywords and linked software pages so new content joins the cluster automatically.
Can Zektrx turn these resources into workflows?
Yes. Zektrx connects templates, records, signatures, actions, evidence and reports so guidance can become a live contractor workflow.
Next Step
Turn permits to work into controlled workflows.
Use Zektrx to connect records, templates, evidence, signatures, actions and reports across your contractor operations.