Make model records easier to trust
BIM and Digital Twin workflows create value when project teams can understand what model was used, what changed, what issues were raised and what evidence supports the final record.
A useful BIM record should make model versions, saved viewpoints, coordination issues and clash checks easy to trace. A useful Digital Twin should connect zones, assets, live signals, evidence and actions to the project record.
BIM records to control
- Federated model register and model source.
- IFC, Revit, Navisworks or glTF file references.
- Saved viewpoints and coordination notes.
- Clash checks, issue owners and resolution evidence.
- Linked drawings, documents, photos and approvals.
Digital Twin records to prepare
- Project zones, spaces, systems and assets.
- Live signals or status fields that need operational context.
- Evidence links for inspections, commissioning and handover.
- Actions for missing information or as-built gaps.
- Handover readiness and completeness checks.
Golden Thread considerations
For Building Safety Act and Golden Thread workflows, software should help organise safety case information, requirements, evidence, dutyholder records, resident engagement, mandatory occurrence reporting notes and BSR-ready actions.
This resource is not legal advice. It is a practical reminder that evidence should be structured, owned, dated, reviewable and exportable when a project needs a stronger information trail.
How Zektrx helps
Zektrx helps contractors connect documents, drawings, quality records, actions and evidence so BIM, Digital Twin and Golden Thread information can be managed as part of the wider project record.
